8/27 - 8/31 | [ 9/1 - 9/4 ] | [ 9/5 - 9/9 ] |
31 08 Tue |
|||
24:00 On the 3rd floor set up, Director Kanechiku is fine tuning the projector. |
"TEXTRON," a work on the 3rd floor, is being adjusted. |
At the 2nd floor dance hall, Professor Sekiguchi is doing woodwork. He is making pieces on-site that are needed on short notice. |
16:00 Local staff Christian and Ufuk are making structures for the exhibition. |
30 08 Mon |
|||
The Design Team comprised of DIT Course volunteers is setting up a banner in the hallway on the 3rd floor. There were 26 banners in all. They were making banners until the day before going to Austria. |
2nd floor. Assembling an exhibition stand for "8 Viewpoints". |
An "InfoScape Project" members puzzling over unexpected computer trouble. There seems to be problem with the hard drive. |
Third day of setting up. Disarray ensues on the 2nd floor. |
Students are painting and filing a stand where they will place an artwork. They are in the garden at the university where the event will take place. |
The morning starts with the daily discussion. Today, part of the core staff was there from 7:30. |
29 08 Sun |
|||
The 50 or so IAMAS Campus Exhibition members went to a church on a hill that afforded sweeping view of urban Linz. Trekking out to the church seemed just like a school field trip. In the view of the evening urban landscape of Linz, the remodeled art museum in Linz floated mysteriously above the Danube River. |
27 08 Fri |
|||
20:50. It was off to the beer garden to celebrate the first day of setting up. Over 50 IAMAS members gathered for the fun. |
13:00. The students joined in the effort, and the setting-up process got fully underway. |
10:00. The boxes were carried to the hall, and temporarily filled up the entrance way. |
09:25. Hauptplatz, the square located in the center of Linz, Austria. Our equipment, which had been transported by air in a large container, arrived at the exhibition hall facing the square. Most of it arrived safely. |